With 12 years of OEM & ODM manufacturing experience, Fupower sets flexible MOQ and clear production lead times for auto modification customized parts. Requirements differ greatly based on customization depth: simple logo finishing, existing mold modification, and full new mold development have separate standards.
1. MOQ Classification for Different Customization Modes
Light Customization (Private Logo, Surface Finishing, Package Adjustment, Existing Standard Products)
Applicable products: exhaust systems, silicone hoses, intake kits, conventional CNC fittings
MOQ: 20–50 units per model
Features: No new molds required, only laser engraving, paint color change and outer packaging adjustment, suitable for new dealers’ trial orders.
Medium Customization (Size Revision, Structural Fine-tuning, Model-specific Dedicated Parts)
Applicable products: modified piping elbows, customized exhaust flanges, special-size silicone hoses
MOQ: 100–300 units per specification
Features: Minor fixture adjustment on existing molds, low additional production cost.
Deep Customization (Full New Mold Development, Exclusive ODM Drawing Design)
Applicable products: brand-exclusive exhaust shapes, special carbon fiber housings, non-standard CNC structural parts
MOQ: 500–1000 units per batch
Features: Independent mold opening and engineering verification, long-term mass order cooperation recommended to share mold cost.
Special Product MOQ Reference
Dry carbon fiber parts: 50–200 units
Jet ski & ATV dedicated accessories: 50–150 units
Racing high-pressure reinforced silicone hoses: 100–300 units
2. Standard Lead Time Arrangement
Sampling Period
Simple logo/surface sample: 3–7 working days
Structural revised sample: 7–12 working days
New mold prototype sample: 15–30 working days
Mass Production Lead Time (after sample confirmation)
Light customized orders: 7–15 working days
Medium structural revised orders: 18–28 working days
New mold full customized bulk orders: 30–45 working days
Large container orders above 2000 units: Negotiable production schedule, normally 35–50 working days
Influencing Factors of Lead Time
Complexity: Carbon fiber and precision CNC parts take longer than stainless steel exhaust and silicone hose products;
Urgent orders: Fupower supports expedited production with extra fees, shortening cycle by 30%.
3. Fupower Friendly Cooperation Rules
Mixed batch consolidation: Multiple SKUs combined to reach MOQ standard for small buyers;
Mold ownership: Long-term cooperative customers can own exclusive molds after reaching agreed order volume;
Stable delivery guarantee: Written delivery time commitment with compensation clauses for delayed delivery;
Gradual order expansion: Support small trial orders first, then scale up to large wholesale.